IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

982

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0422 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $484 $164 Implemented
SU0422 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $153 $150 Implemented
SU0422 # 07 Y:2016 07 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $189 $332 Implemented
SU0422 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,567 $25,530 Implemented
IP0073 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,406 $6 Implemented
IP0073 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $843 $23 Implemented
IP0073 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,568 $227 Implemented
IP0073 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $3,721 $476 Implemented
IP0073 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,432 $3,249 Implemented
IP0072 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $935 $0 Implemented
IP0072 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $410 $4 Implemented
IP0072 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,514 $85 Implemented
IP0072 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,720 $671 Implemented
IP0072 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $415 $78 Implemented
IP0072 # 06 Y:2016 06 2016 INSTALL TIMERS AND/OR THERMOSTATS $1,837 $555 Implemented
IP0072 # 07 Y:2016 07 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $391 $768 Implemented
IP0072 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,378 $6,703 Implemented
IA0560 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,818 $1,011 Implemented
IA0560 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,092 $200 Implemented
IA0560 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $819 $1,000 Implemented
MZ0214 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,834 $28,800 Implemented
MZ0214 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,540 $860 Implemented
MZ0214 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,228 $1,100 Implemented
SD0527 # 02 Y:2016 02 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $14,603 $79,274 Implemented
LE0403 # 01 Y:2015 01 2015 INSTALL TIMERS AND/OR THERMOSTATS $1,886 $0 Implemented