IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0017 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $694 $700 Implemented
UU0017 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $277 $220 Implemented
UU0014 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $620 $440 Implemented
UU0014 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,319 $60 Implemented
WI0405 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,749 $2,000 Implemented
WI0405 # 04 Y:2001 04 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,138 $0 Implemented
WI0405 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,216 $500 Implemented
WI0405 # 01 Y:2001 01 2001 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $5,787 $4,500 Implemented
TA0010 # 08 Y:2001 08 2001 INSTALL OCCUPANCY SENSORS $1,319 $460 Implemented
TA0010 # 10 Y:2001 10 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $520 $0 Implemented
TA0010 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $755 $984 Implemented
TA0010 # 04 Y:2001 04 2001 PAY UTILITY BILLS ON TIME $6,210 $0 Implemented
TA0010 # 06 Y:2001 06 2001 INSULATE FEEDWATER TANK $2,564 $181 Implemented
TA0010 # 01 Y:2001 01 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $69,210 $0 Implemented
TA0010 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,834 $40 Implemented
TA0010 # 02 Y:2001 02 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $29,986 $11,995 Implemented
GT0717 # 09 Y:2001 09 2001 $7,200 $29,314 Implemented
GT0717 # 08 Y:2001 08 2001 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $6,000 $25,180 Implemented
GT0717 # 07 Y:2001 07 2001 FILTER AND REUSE HYDRAULIC OIL $1,030 $1,000 Implemented
GT0717 # 06 Y:2001 06 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,465 $67,250 Implemented
GT0717 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $10,500 Implemented
GT0717 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,765 $16,300 Implemented
SU0103 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $826 $543 Implemented
SU0103 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,743 $0 Implemented
SU0103 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $8,880 $1,125 Implemented