Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,249
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0009 # 03 Y:2022 | 03 | 2022 | ISOLATE HOT OR COLD EQUIPMENT | $1,187 | $0 | Implemented |
MU0009 # 04 Y:2022 | 04 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $821 | $90 | Implemented |
MU0009 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $352 | $0 | Implemented |
MU0009 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $348 | $795 | Implemented |
TT0275 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $32,630 | $34,500 | Not Implemented |
TT0275 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,633 | $2,905 | Implemented |
TT0275 # 03 Y:2022 | 03 | 2022 | IMPROVE SPACE COMFORT CONDITIONING | $11,751 | $28,120 | Not Implemented |
TT0275 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $8,032 | $30,830 | Not Implemented |
TT0275 # 05 Y:2022 | 05 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,126 | $50 | Not Implemented |
TT0275 # 06 Y:2022 | 06 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $3,488 | $9,000 | Implemented |
TT0275 # 07 Y:2022 | 07 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,643 | $2,500 | Not Implemented |
TT0275 # 08 Y:2022 | 08 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,083 | $500 | Not Implemented |
LE0526 # 01 Y:2022 | 01 | 2022 | PAY UTILITY BILLS ON TIME | $671 | $0 | Implemented |
LE0526 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,267 | $1,927 | Implemented |
LE0526 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,461 | $2,205 | Implemented |
LE0526 # 04 Y:2022 | 04 | 2022 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,817 | $1,200 | Not Implemented |
LE0526 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,717 | $1,900 | Implemented |
LE0526 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,615 | $3,540 | Implemented |
LE0526 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $728 | $1,800 | Not Implemented |
LE0526 # 08 Y:2022 | 08 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,661 | $48,235 | Implemented |
LE0526 # 09 Y:2022 | 09 | 2022 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $37,269 | $125,000 | Not Implemented |
LE0521 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $777 | $35 | Implemented |
LE0521 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,021 | $800 | Not Implemented |
LE0521 # 04 Y:2022 | 04 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,127 | $1,200 | Implemented |
LE0521 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,148 | $2,956 | Not Implemented |