Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
222
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0119 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,804 | $0 | Implemented |
CW0119 # 06 Y:2021 | 06 | 2021 | IMPROVE LUBRICATION PRACTICES | $21,048 | $10,400 | Not Implemented |
CW0119 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,554 | $0 | Not Implemented |
CW0119 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,381 | $6,000 | Implemented |
CW0119 # 07 Y:2021 | 07 | 2021 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $5,837 | $1,000 | Implemented |
CW0119 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,741 | $613 | Not Implemented |
UD1033 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $2,775 | $800 | Not Implemented |
UD1033 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $555 | $676 | Not Implemented |
UD1033 # 06 Y:2022 | 06 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,359 | $4,615 | Not Implemented |
UD1033 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,185 | $2,250 | Not Implemented |
UD1033 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,955 | $6,000 | Implemented |
UD1033 # 01 Y:2022 | 01 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $633 | $0 | Not Implemented |
UD1016 # 06 Y:2020 | 06 | 2020 | USE RADIANT HEATER FOR SPOT HEATING | $2,079 | $7,980 | Not Implemented |
UD1016 # 03 Y:2020 | 03 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $433 | $0 | Not Implemented |
UD1016 # 05 Y:2020 | 05 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $8,764 | $42,000 | Implemented |
UD1016 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $966 | $0 | Implemented |
UD1016 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $85 | $0 | Not Implemented |
UD1016 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,918 | $1,358 | Not Implemented |
UD1016 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,232 | $18,000 | Implemented |
UD1016 # 07 Y:2020 | 07 | 2020 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $772 | $50 | Not Implemented |
WV0456 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,765 | $41,700 | Not Implemented |
WV0456 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,518 | $95,285 | Implemented |
WV0456 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,893 | $58,995 | Implemented |
WV0456 # 05 Y:2012 | 05 | 2012 | IMPROVE COMBUSTION CONTROL CAPABILITY | $11,368 | $38,096 | Not Implemented |
WV0456 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,458 | $2,000 | Not Implemented |