IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

222

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0119 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,804 $0 Implemented
CW0119 # 06 Y:2021 06 2021 IMPROVE LUBRICATION PRACTICES $21,048 $10,400 Not Implemented
CW0119 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,554 $0 Not Implemented
CW0119 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,381 $6,000 Implemented
CW0119 # 07 Y:2021 07 2021 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $5,837 $1,000 Implemented
CW0119 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,741 $613 Not Implemented
UD1033 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $2,775 $800 Not Implemented
UD1033 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $555 $676 Not Implemented
UD1033 # 06 Y:2022 06 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,359 $4,615 Not Implemented
UD1033 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,185 $2,250 Not Implemented
UD1033 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,955 $6,000 Implemented
UD1033 # 01 Y:2022 01 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $633 $0 Not Implemented
UD1016 # 06 Y:2020 06 2020 USE RADIANT HEATER FOR SPOT HEATING $2,079 $7,980 Not Implemented
UD1016 # 03 Y:2020 03 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $433 $0 Not Implemented
UD1016 # 05 Y:2020 05 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $8,764 $42,000 Implemented
UD1016 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $966 $0 Implemented
UD1016 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $85 $0 Not Implemented
UD1016 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,918 $1,358 Not Implemented
UD1016 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,232 $18,000 Implemented
UD1016 # 07 Y:2020 07 2020 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $772 $50 Not Implemented
WV0456 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,765 $41,700 Not Implemented
WV0456 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,518 $95,285 Implemented
WV0456 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,893 $58,995 Implemented
WV0456 # 05 Y:2012 05 2012 IMPROVE COMBUSTION CONTROL CAPABILITY $11,368 $38,096 Not Implemented
WV0456 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,458 $2,000 Not Implemented