IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,249

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0011 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,058 $0 Implemented
IP0011 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,428 $0 Implemented
IP0011 # 05 Y:2013 05 2013 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $980 $0 Implemented
IP0011 # 06 Y:2013 06 2013 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $131,250 $15,000 Not Implemented
IP0011 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,449 $1,081 Not Implemented
IP0011 # 08 Y:2013 08 2013 OPTIMIZE PLANT POWER FACTOR $14,000 $9,864 Not Implemented
IP0011 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,010 $27,442 Implemented
UA0091 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,610 $1,600 Not Implemented
UA0091 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $710 $1,300 Implemented
UA0091 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $2,368 $546 Implemented
UA0091 # 04 Y:2012 04 2012 REDUCE VENTILATION AIR $132 $210 Not Implemented
UA0090 # 01 Y:2012 01 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $11,862 $26,757 Not Implemented
UA0090 # 02 Y:2012 02 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,021 $2,488 Not Implemented
UA0090 # 03 Y:2012 03 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,678 $142 Implemented
UA0090 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,518 $13,900 Not Implemented
UA0090 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $6,230 $4,203 Not Implemented
UA0090 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,138 $2,200 Implemented
UA0090 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,484 $12,249 Not Implemented
SU0325 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $46,347 $5,200 Not Implemented
SU0325 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,105 $2,640 Implemented
SU0325 # 03 Y:2012 03 2012 ELIMINATE/REDUCE AN OPERATION $24,636 $20,468 Implemented
SU0325 # 04 Y:2012 04 2012 REDUCE VENTILATION AIR $1,286 $5,127 Not Implemented
SU0325 # 05 Y:2012 05 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,516 $10,889 Not Implemented
IP0004 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,520 $0 Implemented
IP0004 # 02 Y:2012 02 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,343 $0 Implemented