IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0422 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $484 $164 Implemented
SU0422 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $153 $150 Implemented
SU0422 # 06 Y:2016 06 2016 REDUCE VENTILATION AIR $846 $880 Not Implemented
SU0422 # 07 Y:2016 07 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $189 $332 Implemented
SU0422 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,567 $25,530 Implemented
SU0422 # 05 Y:2016 05 2016 ELIMINATE/REDUCE AN OPERATION $880 $960 Not Implemented
SU0369 # 05 Y:2014 05 2014 USE PHOTOCELL CONTROLS $765 $1,578 Not Implemented
SU0369 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,104 $0 Not Implemented
SU0369 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,078 $20,000 Implemented
SU0369 # 03 Y:2014 03 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $463 $0 Implemented
SU0369 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,903 $1,500 Not Implemented
SU0369 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,180 $15,512 Not Implemented
SU0369 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $1,532 $3,780 Not Implemented
SU0369 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $615 $3,090 Not Implemented
SU0345 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $132 Not Implemented
SU0345 # 01 Y:2013 01 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $97 $0 Not Implemented
SU0345 # 03 Y:2013 03 2013 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $335 $738 Not Implemented
SU0345 # 04 Y:2013 04 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $155 $655 Not Implemented
SU0345 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $50 $238 Not Implemented
SU0325 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $46,347 $5,200 Not Implemented
SU0325 # 05 Y:2012 05 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,516 $10,889 Not Implemented
SU0325 # 04 Y:2012 04 2012 REDUCE VENTILATION AIR $1,286 $5,127 Not Implemented
SU0325 # 03 Y:2012 03 2012 ELIMINATE/REDUCE AN OPERATION $24,636 $20,468 Implemented
SU0325 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,105 $2,640 Implemented
SU0322 # 07 Y:2012 07 2012 UPGRADE OBSOLETE EQUIPMENT $1,164 $5,472 Implemented