IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0416 # 08 Y:2002 08 2002 REPLACE CLOTH RAGS WITH PAPER TOWELS $690 $0 Not Implemented
WI0416 # 09 Y:2002 09 2002 RECOVER WASTE HEAT FROM EQUIPMENT $477 $0 Implemented
WI0405 # 01 Y:2001 01 2001 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $5,787 $4,500 Implemented
WI0405 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,749 $2,000 Implemented
WI0405 # 03 Y:2001 03 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $3,585 $11,000 Not Implemented
WI0405 # 04 Y:2001 04 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,138 $0 Implemented
WI0405 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,216 $500 Implemented
WI0405 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,839 $9,403 Not Implemented
WI0405 # 07 Y:2001 07 2001 REPLACE CLOTH RAGS WITH PAPER TOWELS $759 $0 Not Implemented
WI0405 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $640 Not Implemented
WI0405 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $269 $570 Not Implemented
WI0076 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $1,952 $1,000 Not Implemented
WI0076 # 01 Y:1990 01 1990 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $19,921 $0 Not Implemented
WI0076 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,064 $12,726 Not Implemented
WI0076 # 03 Y:1990 03 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,784 $0 Not Implemented
WI0076 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,725 $3,750 Not Implemented
WI0076 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,725 $0 Not Implemented
WI0076 # 07 Y:1990 07 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,709 $500 Not Implemented
WI0076 # 08 Y:1990 08 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,107 $1,000 Not Implemented
WI0076 # 09 Y:1990 09 1990 INSTALL STORM WINDOWS AND DOORS $482 $1,440 Not Implemented
WI0036 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $4,529 $0 Implemented
WI0036 # 08 Y:1988 08 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,608 $5,500 Implemented
WI0036 # 07 Y:1988 07 1988 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,459 $0 Implemented
WI0036 # 06 Y:1988 06 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,820 $5,000 Not Implemented
WI0036 # 05 Y:1988 05 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $751 $1,300 Not Implemented