IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

119

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0527 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,941 $13,433 Not Implemented
SD0527 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $6,598 $200 Not Implemented
SD0527 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,151 $7,500 Not Implemented
SD0527 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,088 $1,000 Not Implemented
SD0527 # 08 Y:2016 08 2016 USE PHOTOCELL CONTROLS $1,432 $1,665 Not Implemented
SD0527 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $701 $200 Not Implemented
SD0527 # 10 Y:2016 10 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $463 $1,300 Not Implemented
SD0379 # 01 Y:2006 01 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $212,485 $900,288 Not Implemented
SD0379 # 02 Y:2006 02 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $169,122 $0 Not Implemented
SD0379 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $110,534 $160,385 Not Implemented
SD0379 # 04 Y:2006 04 2006 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $82,170 $150,000 Not Implemented
SD0379 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,140 $18,110 Not Implemented
SD0379 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,974 $220 Implemented
SD0335 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,899 $8,001 Not Implemented
SD0335 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,194 $80 Not Implemented
SD0335 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $857 $0 Implemented
SD0335 # 04 Y:2004 04 2004 REUSE RICH WHITE WATER IN OTHER APPLICATIONS $10,570 $14,000 Not Implemented
SD0335 # 05 Y:2004 05 2004 REDESIGN PROCESS $12,125 $8,000 Implemented
NV0108 # 01 Y:1998 01 1998 INSULATE BARE EQUIPMENT $1,042 $768 Not Implemented
NV0108 # 02 Y:1998 02 1998 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $11,472 $15,808 Implemented
NV0108 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $259 $0 Implemented
NV0108 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,992 $350 Implemented
NV0108 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $148 $252 Not Implemented
NV0108 # 06 Y:1998 06 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $794 $220 Implemented
SF0121 # 01 Y:1997 01 1997 USE PHOTOCELL CONTROLS $1,069 $1,500 Implemented