Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,249
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0222 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,656 | $1,064 | Not Implemented |
IA0222 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $561 | $931 | Implemented |
IA0222 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $391 | $33 | Implemented |
IA0222 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $421 | $226 | Implemented |
IA0222 # 05 Y:1999 | 05 | 1999 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $5,097 | $3,584 | Not Implemented |
IA0222 # 06 Y:1999 | 06 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $3,600 | $900 | Implemented |
IA0222 # 07 Y:1999 | 07 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,900 | $3,000 | Not Implemented |
IA0222 # 08 Y:1999 | 08 | 1999 | ADD ADDITIONAL PRODUCTION SHIFT | $199,932 | $425,000 | Implemented |
IA0222 # 09 Y:1999 | 09 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $17,160 | $25,792 | Not Implemented |
IA0222 # 10 Y:1999 | 10 | 1999 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $512 | $1,200 | Not Implemented |
UD0575 # 01 Y:1999 | 01 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $480,000 | $175,000 | Not Implemented |
UD0575 # 02 Y:1999 | 02 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $144,000 | $150,000 | Not Implemented |
UD0575 # 03 Y:1999 | 03 | 1999 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $39,515 | $10,000 | Implemented |
UD0575 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,341 | $15,000 | Implemented |
WI0350 # 01 Y:1999 | 01 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,546 | $13,122 | Implemented |
WI0350 # 02 Y:1999 | 02 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,263 | $500 | Not Implemented |
WI0350 # 03 Y:1999 | 03 | 1999 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $1,981 | $0 | Not Implemented |
WI0350 # 04 Y:1999 | 04 | 1999 | REDUCE VENTILATION AIR | $1,508 | $1,000 | Not Implemented |
WI0350 # 05 Y:1999 | 05 | 1999 | USE OPTIMUM THICKNESS INSULATION | $1,212 | $1,538 | Not Implemented |
WI0350 # 06 Y:1999 | 06 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $474 | $500 | Implemented |
WI0350 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $456 | $740 | Implemented |
UM0140 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $18,168 | $780 | Not Implemented |
UM0140 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,110 | $600 | Not Implemented |
UM0140 # 03 Y:1999 | 03 | 1999 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $27,426 | $13,000 | Not Implemented |
UM0140 # 04 Y:1999 | 04 | 1999 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,688 | $3,600 | Not Implemented |