IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,249

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0171 # 05 Y:1996 05 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $16,272 $2,280 Not Implemented
MO0171 # 06 Y:1996 06 1996 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $303 $850 Not Implemented
MO0171 # 07 Y:1996 07 1996 RECOVER AND REUSE WASTE MATERIAL $810 $100 Implemented
NV0053 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,776 $302 Implemented
NV0053 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,192 $310 Not Implemented
NV0053 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,194 $300 Implemented
NV0053 # 04 Y:1996 04 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $857 $1,625 Not Implemented
NV0053 # 05 Y:1996 05 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $706 $25 Not Implemented
NV0053 # 06 Y:1996 06 1996 OPTIMIZE PLANT POWER FACTOR $2,604 $9,740 Not Implemented
NV0053 # 07 Y:1996 07 1996 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $598 $1,400 Not Implemented
NV0053 # 08 Y:1996 08 1996 INSULATE BARE EQUIPMENT $3,287 $878 Implemented
NV0053 # 09 Y:1996 09 1996 INSTALL TIMERS AND/OR THERMOSTATS $3,417 $1,504 Implemented
NV0053 # 10 Y:1996 10 1996 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $205 $340 Not Implemented
NV0053 # 11 Y:1996 11 1996 HEAT WATER WITH EXHAUST HEAT $9,600 $1,000 Not Implemented
UD0488 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $4,372 $4,000 Implemented
UD0488 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,843 $3,000 Implemented
UD0488 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $997 $2,500 Not Implemented
UD0488 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,037 $8,010 Implemented
WI0248 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $3,240 $800 Implemented
WI0248 # 02 Y:1995 02 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,647 $7,000 Implemented
WI0248 # 03 Y:1995 03 1995 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,170 $1,000 Implemented
WI0248 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $779 $640 Not Implemented
WI0248 # 05 Y:1995 05 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $656 $2,000 Implemented
WI0248 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $539 $2,160 Not Implemented
WI0248 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $157 $514 Implemented