IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0009 # 02 Y:2022 02 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $3,019 $855 Implemented
MU0009 # 03 Y:2022 03 2022 ISOLATE HOT OR COLD EQUIPMENT $1,187 $0 Implemented
MU0009 # 04 Y:2022 04 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $821 $90 Implemented
MU0009 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $352 $0 Implemented
MU0009 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $348 $795 Implemented
MU0009 # 01 Y:2022 01 2022 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $9,128 $0 Not Implemented
UM0412 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $775 $100 Not Implemented
UM0412 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,923 $1,300 Implemented
UM0412 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $874 $1,000 Implemented
UM0412 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,482 $600 Not Implemented
UM0412 # 06 Y:2012 06 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,939 $4,000 Not Implemented
UM0412 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,308 $2,850 Implemented
UM0291 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $396 $150 Not Implemented
UM0291 # 07 Y:2005 07 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,325 $1,265 Implemented
UM0291 # 06 Y:2005 06 2005 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $2,309 $39,000 Not Implemented
UM0291 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,841 $1,490 Not Implemented
UM0291 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,427 $1,900 Implemented
UM0291 # 03 Y:2005 03 2005 COVER OPEN TANKS $4,518 $2,366 Implemented
UM0291 # 02 Y:2005 02 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $18,138 $19,073 Not Implemented
UM0291 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $20,293 $9,000 Implemented
UM0140 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,110 $600 Not Implemented
UM0140 # 07 Y:1999 07 1999 $36,686 $0 Not Implemented
UM0140 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,168 $780 Not Implemented
UM0140 # 04 Y:1999 04 1999 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,688 $3,600 Not Implemented
UM0140 # 05 Y:1999 05 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $225,811 $90,000 Not Implemented