IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0437 # 04 Y:2024 04 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $288,884 $300,000 n/a
MS0437 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $34,017 $458,990 n/a
MS0437 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $272 $2,237 n/a
MS0437 # 01 Y:2024 01 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $147 $0 n/a
MS0436 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $822 $15,226 n/a
MS0436 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $52,267 $553,175 n/a
MS0436 # 01 Y:2024 01 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $4,420 $255 n/a
MS0436 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $13,430 $50,000 n/a
MS0433 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $48,250 $482,125 n/a
MS0433 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $750 $393 n/a
MS0433 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $8,443 $4,229 n/a
MS0433 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $1,821 n/a
MS0433 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,497 $0 n/a
MS0433 # 06 Y:2024 06 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $13,222 $50,000 n/a
MS0419 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $317 $1,202 n/a
MS0419 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $256 $1,217 n/a
MS0419 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,886 $0 n/a
MS0419 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $47,025 $389,760 n/a
MS0260 # 04 Y:2004 04 2004 INSTALL TIMERS AND/OR THERMOSTATS $3,685 $1,666 Not Implemented
MS0260 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $811 $348 Implemented
MS0260 # 06 Y:2004 06 2004 DISCONNECT BALLASTS $341 $408 Implemented
MS0260 # 07 Y:2004 07 2004 COVER OPEN TANKS $312 $68 Not Implemented
MS0260 # 03 Y:2004 03 2004 MINIMIZE WATER USAGE $9,057 $107 Not Implemented
MS0260 # 01 Y:2004 01 2004 CLEAR AND RENT EXISTING SPACE $28,604 $10,000 Not Implemented
MS0260 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,850 $1,350 Not Implemented