Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0211 # 07 Y:1998 | 07 | 1998 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $24,960 | $25,440 | Implemented |
IA0211 # 06 Y:1998 | 06 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $57,028 | $800 | Implemented |
IA0211 # 05 Y:1998 | 05 | 1998 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $8,750 | $1,448 | Not Implemented |
IA0211 # 04 Y:1998 | 04 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $20,305 | $2,250 | Implemented |
IA0211 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,935 | $700 | Implemented |
IA0211 # 02 Y:1998 | 02 | 1998 | INSTALL OCCUPANCY SENSORS | $2,579 | $1,064 | Implemented |
IA0211 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,647 | $53,193 | Not Implemented |
NV0108 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $148 | $252 | Not Implemented |
NV0108 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,992 | $350 | Implemented |
NV0108 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $259 | $0 | Implemented |
NV0108 # 02 Y:1998 | 02 | 1998 | INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES | $11,472 | $15,808 | Implemented |
NV0108 # 06 Y:1998 | 06 | 1998 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $794 | $220 | Implemented |
NV0108 # 01 Y:1998 | 01 | 1998 | INSULATE BARE EQUIPMENT | $1,042 | $768 | Not Implemented |
AS0230 # 08 Y:1998 | 08 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $158,264 | $128,600 | Not Implemented |
AS0230 # 07 Y:1998 | 07 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $603 | $30 | Not Implemented |
AS0230 # 06 Y:1998 | 06 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $936 | $60 | Not Implemented |
AS0230 # 05 Y:1998 | 05 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $505 | $675 | Not Implemented |
AS0230 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $171 | $261 | Not Implemented |
AS0230 # 03 Y:1998 | 03 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,253 | $2,300 | Not Implemented |
AS0230 # 02 Y:1998 | 02 | 1998 | INSTALL OCCUPANCY SENSORS | $385 | $675 | Not Implemented |
AS0230 # 01 Y:1998 | 01 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $885 | $60 | Not Implemented |
TN0636 # 01 Y:1998 | 01 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $46,480 | $37,380 | Not Implemented |
TN0636 # 05 Y:1998 | 05 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $175 | $0 | Implemented |
TN0636 # 03 Y:1998 | 03 | 1998 | INSULATE BARE EQUIPMENT | $670 | $220 | Implemented |
TN0636 # 02 Y:1998 | 02 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,455 | $0 | Not Implemented |