Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0348 # 08 Y:2004 | 08 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,653 | $4,596 | Implemented |
IA0348 # 02 Y:2004 | 02 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,336 | $475 | Not Implemented |
IA0348 # 01 Y:2004 | 01 | 2004 | OPTIMIZE PLANT POWER FACTOR | $9,818 | $10,704 | Implemented |
IA0348 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $651 | $146 | Implemented |
IA0348 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $383 | $120 | Not Implemented |
IA0348 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,888 | $535 | Implemented |
IA0348 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,829 | $14,216 | Implemented |
IA0348 # 06 Y:2004 | 06 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $193 | $438 | Not Implemented |
OR0470 # 03 Y:2004 | 03 | 2004 | ELIMINATE/REDUCE AN OPERATION | $9,627 | $250 | Not Implemented |
OR0470 # 04 Y:2004 | 04 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,990 | $300 | Not Implemented |
OR0470 # 05 Y:2004 | 05 | 2004 | ELIMINATE/REDUCE AN OPERATION | $1,185 | $165 | Implemented |
OR0470 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $92,000 | $1,200 | Not Implemented |
OR0470 # 02 Y:2004 | 02 | 2004 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $11,400 | $2,800 | Not Implemented |
BD0270 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,453 | $3,500 | Not Implemented |
BD0270 # 12 Y:2004 | 12 | 2004 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $0 | $3,000 | Not Implemented |
BD0270 # 11 Y:2004 | 11 | 2004 | MINIMIZE WATER USAGE | $3,135 | $1,320 | Not Implemented |
BD0270 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $353 | $168 | Implemented |
BD0270 # 09 Y:2004 | 09 | 2004 | USE PHOTOCELL CONTROLS | $1,040 | $320 | Implemented |
BD0270 # 08 Y:2004 | 08 | 2004 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,173 | $75 | Implemented |
BD0270 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,382 | $750 | Implemented |
BD0270 # 05 Y:2004 | 05 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $4,757 | $1,000 | Not Implemented |
BD0270 # 04 Y:2004 | 04 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,396 | $480 | Not Implemented |
BD0270 # 03 Y:2004 | 03 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $11,491 | $18,616 | Not Implemented |
BD0270 # 02 Y:2004 | 02 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $13,615 | $24,000 | Implemented |
BD0270 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,872 | $0 | Implemented |