IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0472 # 02 Y:2011 02 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $18,811 $15,000 Not Implemented
IA0472 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,302 $420 Implemented
IA0472 # 04 Y:2011 04 2011 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,084 $358 Implemented
IA0472 # 05 Y:2011 05 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,002 $3,600 Not Implemented
IA0472 # 06 Y:2011 06 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,318 $12,000 Not Implemented
IA0472 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,172 $10,141 Implemented
IA0472 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $421 $1,228 Implemented
IA0472 # 01 Y:2011 01 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,238 $9,000 Not Implemented
OK0815 # 06 Y:2011 06 2011 DISCONNECT BALLASTS $849 $696 Not Implemented
OK0815 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $3,531 $633 Implemented
OK0815 # 08 Y:2011 08 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,335 $20,544 Not Implemented
OK0815 # 07 Y:2011 07 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $15,876 $3,096 Not Implemented
OK0815 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $2,608 $2,198 Not Implemented
OK0815 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $950 Implemented
OK0815 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,341 $930 Implemented
OK0815 # 02 Y:2011 02 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,351 $0 Implemented
OK0815 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $57,281 $13,000 Not Implemented
AM0598 # 01 Y:2011 01 2011 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $665,600 $1,000,000 Not Implemented
AM0598 # 02 Y:2011 02 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $176,800 $119,000 Implemented
AM0598 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,540 $12,900 Implemented
AM0598 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,800 $1,000 Implemented
AM0598 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,800 $3,800 Implemented
AM0598 # 06 Y:2011 06 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $1,780 $0 Not Implemented
AM0598 # 07 Y:2011 07 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,220 $75 Implemented
AM0598 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $160 Implemented