IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
Reset
SIC 3593 Fluid Power Cylinders & Actuators
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0405 # 01 Y:2001 01 2001 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $5,787 $4,500 Implemented
WI0405 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,749 $2,000 Implemented
WI0405 # 04 Y:2001 04 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,138 $0 Implemented
WI0405 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,216 $500 Implemented
OR0353 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,608 $800 Implemented
OR0353 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $1,927 $5,600 Implemented
TN0636 # 03 Y:1998 03 1998 INSULATE BARE EQUIPMENT $670 $220 Implemented
TN0636 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $175 $0 Implemented
TN0636 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $150 $600 Implemented
DS0094 # 01 Y:1997 01 1997 UTILIZE A LESS EXPENSIVE COOLING METHOD $57,050 $532,891 Implemented
DS0094 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,969 $90 Implemented
DS0094 # 03 Y:1997 03 1997 MINIMIZE WATER USAGE $211 $0 Implemented
IA0164 # 01 Y:1997 01 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $32,289 $800 Implemented
IA0164 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $944 $898 Implemented
IA0164 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,481 $268 Implemented
IA0164 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,647 $20 Implemented
IA0164 # 06 Y:1997 06 1997 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,860 $1,788 Implemented
IA0164 # 07 Y:1997 07 1997 CONVERT TO ELECTROSTATIC POWDER COATING $4,848 $8,000 Implemented
IA0164 # 08 Y:1997 08 1997 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $5,894 $100 Implemented
IA0164 # 09 Y:1997 09 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $8,114 $1,200 Implemented
MS0078 # 01 Y:1997 01 1997 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,069 $470 Implemented
MS0078 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,291 $3,272 Implemented
MS0078 # 05 Y:1997 05 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $2,225 $200 Implemented
MS0078 # 08 Y:1997 08 1997 AUTOMATE FINISHING PROCESS $18,500 $20,000 Implemented
WI0248 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $3,240 $800 Implemented