IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

725

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0194 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,611 $12,000 Implemented
UD0194 # 02 Y:1986 02 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,065 $1,160 Implemented
UD0194 # 03 Y:1986 03 1986 RECOVER WASTE HEAT FROM EQUIPMENT $2,063 $1,000 Implemented
UD0194 # 04 Y:1986 04 1986 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,352 $1,500 Implemented
ST0050 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $415 $100 Implemented
ST0050 # 03 Y:1985 03 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $179 $122 Implemented
ST0050 # 04 Y:1985 04 1985 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $279 $500 Implemented
ST0050 # 05 Y:1985 05 1985 USE COMPRESSOR AIR FILTERS $49 $0 Implemented
ST0050 # 07 Y:1985 07 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,195 $0 Implemented
OK0083 # 01 Y:1983 01 1983 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,427 $3,265 Implemented
OK0083 # 02 Y:1983 02 1983 INSTALL TIMERS AND/OR THERMOSTATS $26,153 $3,160 Implemented
OK0083 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $3,118 $1,600 Implemented
OK0083 # 04 Y:1983 04 1983 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,097 $200 Implemented
OK0083 # 05 Y:1983 05 1983 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $323 $730 Implemented
OK0083 # 06 Y:1983 06 1983 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $454 $130 Implemented
OK0083 # 07 Y:1983 07 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $16,433 $34,221 Implemented
OK0083 # 08 Y:1983 08 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $469 $127 Implemented
UD0061 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $72 $0 Implemented
UD0045 # 01 Y:1982 01 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $229 $400 Implemented
UD0045 # 02 Y:1982 02 1982 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,586 $7,000 Implemented
UD0045 # 03 Y:1982 03 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,451 $3,100 Implemented
UD0041 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,083 $590 Implemented
UD0041 # 04 Y:1982 04 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $420 $0 Implemented
OK0024 # 05 Y:1982 05 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,135 $0 Implemented
UD0026 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $297 $48 Implemented