Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
725
matching recommendationsSIC | 3599 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0194 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,611 | $12,000 | Implemented |
UD0194 # 02 Y:1986 | 02 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,065 | $1,160 | Implemented |
UD0194 # 03 Y:1986 | 03 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,063 | $1,000 | Implemented |
UD0194 # 04 Y:1986 | 04 | 1986 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,352 | $1,500 | Implemented |
ST0050 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $415 | $100 | Implemented |
ST0050 # 03 Y:1985 | 03 | 1985 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $179 | $122 | Implemented |
ST0050 # 04 Y:1985 | 04 | 1985 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $279 | $500 | Implemented |
ST0050 # 05 Y:1985 | 05 | 1985 | USE COMPRESSOR AIR FILTERS | $49 | $0 | Implemented |
ST0050 # 07 Y:1985 | 07 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,195 | $0 | Implemented |
OK0083 # 01 Y:1983 | 01 | 1983 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,427 | $3,265 | Implemented |
OK0083 # 02 Y:1983 | 02 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $26,153 | $3,160 | Implemented |
OK0083 # 03 Y:1983 | 03 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $3,118 | $1,600 | Implemented |
OK0083 # 04 Y:1983 | 04 | 1983 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,097 | $200 | Implemented |
OK0083 # 05 Y:1983 | 05 | 1983 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $323 | $730 | Implemented |
OK0083 # 06 Y:1983 | 06 | 1983 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $454 | $130 | Implemented |
OK0083 # 07 Y:1983 | 07 | 1983 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $16,433 | $34,221 | Implemented |
OK0083 # 08 Y:1983 | 08 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $469 | $127 | Implemented |
UD0061 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $72 | $0 | Implemented |
UD0045 # 01 Y:1982 | 01 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $229 | $400 | Implemented |
UD0045 # 02 Y:1982 | 02 | 1982 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,586 | $7,000 | Implemented |
UD0045 # 03 Y:1982 | 03 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,451 | $3,100 | Implemented |
UD0041 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,083 | $590 | Implemented |
UD0041 # 04 Y:1982 | 04 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $420 | $0 | Implemented |
OK0024 # 05 Y:1982 | 05 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,135 | $0 | Implemented |
UD0026 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $297 | $48 | Implemented |