Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,657

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0057 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,029 $12,535 Not Implemented
LE0304 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,592 $15,000 Not Implemented
LE0304 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,396 $273 Implemented
LE0304 # 08 Y:2010 08 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,370 $0 Not Implemented
LE0304 # 09 Y:2010 09 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,073 $5,740 Not Implemented
LE0304 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $803 $2,400 Not Implemented
LE0304 # 11 Y:2010 11 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,692 $14,758 Implemented
LE0304 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,240 $11,654 Implemented
LE0304 # 01 Y:2010 01 2010 USE RADIANT HEATER FOR SPOT HEATING $300,000 $40,932 Not Implemented
LE0304 # 02 Y:2010 02 2010 USE RADIANT HEATER FOR SPOT HEATING $55,099 $39,415 Not Implemented
LE0304 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,822 $18,000 Not Implemented
LE0304 # 04 Y:2010 04 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,355 $100,000 Not Implemented
LE0304 # 05 Y:2010 05 2010 INSTALL TIMERS AND/OR THERMOSTATS $12,804 $30 Implemented
BD0374 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $440 $1,000 Implemented
BD0374 # 11 Y:2010 11 2010 MINIMIZE WATER USAGE $31,680 $1,800 Not Implemented
BD0374 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,008 $3,000 Implemented
BD0374 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,840 $11,833 Not Implemented
BD0374 # 03 Y:2010 03 2010 USE RADIANT HEATER FOR SPOT HEATING $15,507 $18,616 Not Implemented
BD0374 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,533 $35 Not Implemented
BD0374 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $6,673 $1,360 Not Implemented
BD0374 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,878 $3,500 Not Implemented
BD0374 # 07 Y:2010 07 2010 ADJUST BURNERS FOR EFFICIENT OPERATION $1,855 $10,000 Not Implemented
BD0374 # 08 Y:2010 08 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,128 $62 Not Implemented
BD0374 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678 $875 Implemented
OK0779 # 01 Y:2009 01 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,513 $900,000 Not Implemented