IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,619

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0418 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $1,796 $1,143 Not Implemented
MI0418 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,311 $1,060 Implemented
UF0588 # 05 Y:2022 05 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $14,162 $12,350 Implemented
UF0588 # 07 Y:2022 07 2022 IMPROVE SPACE COMFORT CONDITIONING $9,728 $4,480 Implemented
UF0588 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,352 $0 Implemented
UF0588 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,751 $17,178 Implemented
UF0588 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,121 $756 Implemented
UF0588 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $84,856 $35,131 Not Implemented
UF0588 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $91,215 $297,040 Implemented
OK1084 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,015 $4,620 Not Implemented
OK1084 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $28,652 $258,706 Not Implemented
OK1084 # 03 Y:2023 03 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,393 $6,035 Not Implemented
LT8365 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,577 $1,300 n/a
LT8365 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $55,888 $0 n/a
LT8365 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,434 $216,000 n/a
UW2213 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,539 $2,080 Not Implemented
UW2213 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,610 $0 Not Implemented
UW2213 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $766 $380 Not Implemented
LE0533 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,161 $4,100 Not Implemented
LE0533 # 02 Y:2022 02 2022 USE RADIANT HEATER FOR SPOT HEATING $3,206 $3,500 Not Implemented
LE0533 # 03 Y:2022 03 2022 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,231 $50,000 Not Implemented
LE0533 # 04 Y:2022 04 2022 BURN A LESS EXPENSIVE GRADE OF FUEL $24,359 $62,500 Not Implemented
LE0533 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,998 $18,621 Not Implemented
LE0533 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,903 $6,154 Not Implemented
LE0526 # 01 Y:2022 01 2022 PAY UTILITY BILLS ON TIME $671 $0 Implemented