IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0348 # 08 Y:2004 08 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,653 $4,596 Implemented
IA0348 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $383 $120 Not Implemented
IA0348 # 06 Y:2004 06 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $193 $438 Not Implemented
IA0348 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,829 $14,216 Implemented
IA0348 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,888 $535 Implemented
IA0348 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $651 $146 Implemented
IA0348 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $9,818 $10,704 Implemented
IA0348 # 02 Y:2004 02 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,336 $475 Not Implemented
DS0161 # 07 Y:2000 07 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $1,560 $3,000 Not Implemented
DS0161 # 08 Y:2000 08 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,203 $0 Implemented
DS0161 # 06 Y:2000 06 2000 BURN WASTE OIL FOR HEAT $1,329 $3,495 Not Implemented
DS0161 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $758 $1,130 Implemented
DS0161 # 04 Y:2000 04 2000 INSTALL TIMERS AND/OR THERMOSTATS $1,142 $2,040 Implemented
DS0161 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,603 $180 Not Implemented
DS0161 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $1,323 $1,050 Implemented
DS0161 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,330 $7,355 Implemented
IA0222 # 10 Y:1999 10 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $512 $1,200 Not Implemented
IA0222 # 09 Y:1999 09 1999 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $17,160 $25,792 Not Implemented
IA0222 # 08 Y:1999 08 1999 ADD ADDITIONAL PRODUCTION SHIFT $199,932 $425,000 Implemented
IA0222 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,656 $1,064 Not Implemented
IA0222 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $561 $931 Implemented
IA0222 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $391 $33 Implemented
IA0222 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $421 $226 Implemented
IA0222 # 05 Y:1999 05 1999 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $5,097 $3,584 Not Implemented
IA0222 # 06 Y:1999 06 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,600 $900 Implemented