IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0251 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,964 $8,610 Implemented
WV0251 # 04 Y:2002 04 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,860 $948 Implemented
WV0251 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,218 $0 Implemented
WV0251 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,295 $180 Implemented
WV0251 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,178 $630 Implemented
WV0251 # 06 Y:2002 06 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,786 $600 Implemented
WV0251 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,709 $180 Implemented
WV0251 # 05 Y:2002 05 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,680 $3,000 Not Implemented
WV0251 # 09 Y:2002 09 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,575 $830 Not Implemented
WV0251 # 10 Y:2002 10 2002 ADD ADDITIONAL PRODUCTION SHIFT $34,000 $2,000 Not Implemented
WV0251 # 11 Y:2002 11 2002 ADVERTISE PRODUCT OR SERVICE $16,140 $1,000 Implemented
MS0208 # 04 Y:2002 04 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $960 $0 Implemented
MS0208 # 05 Y:2002 05 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $905 $374 Not Implemented
MS0208 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $244 $129 Implemented
MS0208 # 02 Y:2002 02 2002 INSTALL TIMERS AND/OR THERMOSTATS $919 $591 Not Implemented
MS0208 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $2,668 $2,700 Not Implemented
WI0417 # 05 Y:2002 05 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,453 $1,560 Not Implemented
WI0417 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,318 $740 Implemented
WI0417 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $923 $1,647 Implemented
WI0417 # 02 Y:2002 02 2002 TREAT AND REUSE RINSE WATERS $7,660 $8,000 Implemented
WI0417 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,600 $1,100 Not Implemented
WI0417 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,606 $339 Implemented
WI0417 # 01 Y:2002 01 2002 RECOVER WASTE HEAT FROM EQUIPMENT $8,160 $2,000 Implemented
WI0417 # 03 Y:2002 03 2002 REPLACE CLOTH RAGS WITH PAPER TOWELS $4,700 $0 Not Implemented
WI0416 # 04 Y:2002 04 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,080 $0 Not Implemented