IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0270 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $7,108 $1,418 Implemented
WV0270 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $5,379 $810 Not Implemented
WV0270 # 07 Y:2003 07 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,894 $500 Not Implemented
WV0270 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,533 $0 Implemented
WV0270 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,034 $250 Not Implemented
WV0270 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,121 $150 Implemented
WV0270 # 03 Y:2003 03 2003 DEVELOP A REPAIR/REPLACE POLICY $6,214 $625 Implemented
WV0270 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,616 $0 Implemented
WV0270 # 12 Y:2003 12 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,750 $4,590 Implemented
WV0270 # 09 Y:2003 09 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,937 $250 Implemented
WV0270 # 11 Y:2003 11 2003 INSTALL OCCUPANCY SENSORS $2,244 $1,450 Implemented
WV0270 # 13 Y:2003 13 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,088 $2,000 Not Implemented
WV0270 # 10 Y:2003 10 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,296 $735 Not Implemented
AM0441 # 02 Y:2003 02 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,585 $0 Not Implemented
AM0441 # 11 Y:2003 11 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $210 $17 Implemented
AM0441 # 10 Y:2003 10 2003 USE SYNTHETIC LUBRICANT $373 $0 Implemented
AM0441 # 09 Y:2003 09 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $250 Implemented
AM0441 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $560 $17 Implemented
AM0441 # 07 Y:2003 07 2003 REUSE RAGS UNTIL COMPLETELY SOILED $1,460 $0 Not Implemented
AM0441 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,490 $500 Implemented
AM0441 # 05 Y:2003 05 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,180 $0 Not Implemented
AM0441 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,330 $300 Implemented
AM0441 # 03 Y:2003 03 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,320 $699 Not Implemented
AM0441 # 01 Y:2003 01 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,700 $410 Implemented
WI0444 # 01 Y:2003 01 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $6,597 $9,000 Implemented