IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0779 # 09 Y:2009 09 2009 INSTALL TIMERS AND/OR THERMOSTATS $7,677 $989 Not Implemented
OK0779 # 08 Y:2009 08 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,812 $1,944 Implemented
OK0779 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,569 $0 Implemented
OK0779 # 01 Y:2009 01 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,513 $900,000 Not Implemented
OK0779 # 02 Y:2009 02 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $122,608 $160,000 Not Implemented
OK0779 # 03 Y:2009 03 2009 USE POWER DURING OFF-PEAK PERIODS $30,940 $0 Not Implemented
OK0779 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,076 $6,396 Not Implemented
OK0779 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,634 $26,750 Implemented
OK0779 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,089 $14,467 Implemented
UD0794 # 09 Y:2009 09 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,223 $1,000 Implemented
UD0794 # 01 Y:2009 01 2009 REDESIGN PROCESS $60,982 $300,000 Not Implemented
UD0794 # 02 Y:2009 02 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $46,758 $0 Not Implemented
UD0794 # 03 Y:2009 03 2009 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $20,779 $50,000 Not Implemented
UD0794 # 04 Y:2009 04 2009 UPGRADE CONTROLS ON COMPRESSORS $9,841 $10,000 Not Implemented
UD0794 # 05 Y:2009 05 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,981 $19,425 Not Implemented
UD0794 # 06 Y:2009 06 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,273 $1,000 Not Implemented
UD0794 # 07 Y:2009 07 2009 UPGRADE CONTROLS ON COMPRESSORS $3,255 $0 Implemented
UD0794 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,202 $0 Implemented
UD0793 # 03 Y:2009 03 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,960 $500 Not Implemented
UD0793 # 12 Y:2009 12 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $435 $0 Not Implemented
UD0793 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $621 $1,000 Implemented
UD0793 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,256 $4,820 Not Implemented
UD0793 # 09 Y:2009 09 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,488 $0 Implemented
UD0793 # 08 Y:2009 08 2009 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,460 $2,500 Implemented
UD0793 # 07 Y:2009 07 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,970 $1,000 Implemented