Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 3599 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0779 # 09 Y:2009 | 09 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $7,677 | $989 | Not Implemented |
OK0779 # 08 Y:2009 | 08 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,812 | $1,944 | Implemented |
OK0779 # 07 Y:2009 | 07 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,569 | $0 | Implemented |
OK0779 # 01 Y:2009 | 01 | 2009 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $36,513 | $900,000 | Not Implemented |
OK0779 # 02 Y:2009 | 02 | 2009 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $122,608 | $160,000 | Not Implemented |
OK0779 # 03 Y:2009 | 03 | 2009 | USE POWER DURING OFF-PEAK PERIODS | $30,940 | $0 | Not Implemented |
OK0779 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,076 | $6,396 | Not Implemented |
OK0779 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,634 | $26,750 | Implemented |
OK0779 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,089 | $14,467 | Implemented |
UD0794 # 09 Y:2009 | 09 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,223 | $1,000 | Implemented |
UD0794 # 01 Y:2009 | 01 | 2009 | REDESIGN PROCESS | $60,982 | $300,000 | Not Implemented |
UD0794 # 02 Y:2009 | 02 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $46,758 | $0 | Not Implemented |
UD0794 # 03 Y:2009 | 03 | 2009 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $20,779 | $50,000 | Not Implemented |
UD0794 # 04 Y:2009 | 04 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $9,841 | $10,000 | Not Implemented |
UD0794 # 05 Y:2009 | 05 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,981 | $19,425 | Not Implemented |
UD0794 # 06 Y:2009 | 06 | 2009 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,273 | $1,000 | Not Implemented |
UD0794 # 07 Y:2009 | 07 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $3,255 | $0 | Implemented |
UD0794 # 08 Y:2009 | 08 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,202 | $0 | Implemented |
UD0793 # 03 Y:2009 | 03 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,960 | $500 | Not Implemented |
UD0793 # 12 Y:2009 | 12 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $435 | $0 | Not Implemented |
UD0793 # 11 Y:2009 | 11 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $621 | $1,000 | Implemented |
UD0793 # 10 Y:2009 | 10 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,256 | $4,820 | Not Implemented |
UD0793 # 09 Y:2009 | 09 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,488 | $0 | Implemented |
UD0793 # 08 Y:2009 | 08 | 2009 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,460 | $2,500 | Implemented |
UD0793 # 07 Y:2009 | 07 | 2009 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,970 | $1,000 | Implemented |