Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsSIC | 3599 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0231 # 04 Y:2020 | 04 | 2020 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $3,981 | $17,881 | Not Implemented |
UA0231 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,318 | $21,905 | Not Implemented |
UA0231 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $538 | $121 | Implemented |
UA0231 # 01 Y:2020 | 01 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $37,963 | $29,625 | Not Implemented |
UA0231 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,885 | $500 | Implemented |
UA0231 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,948 | $4,200 | Implemented |
OK1032 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $417 | $1,804 | Implemented |
OK1032 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $201 | $1,049 | Not Implemented |
OK1032 # 02 Y:2020 | 02 | 2020 | USE RADIANT HEATER FOR SPOT HEATING | $4,244 | $3,000 | Not Implemented |
OK1032 # 01 Y:2020 | 01 | 2020 | OPTIMIZE PLANT POWER FACTOR | $10,720 | $12,215 | Not Implemented |
WV0595 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $119 | $85 | Implemented |
WV0595 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,478 | $12,144 | Not Implemented |
WV0595 # 01 Y:2020 | 01 | 2020 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,138 | $5,700 | Not Implemented |
WV0595 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $1,313 | $6,099 | Implemented |
WV0595 # 04 Y:2020 | 04 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,299 | $4,225 | Not Implemented |
WV0595 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $1,263 | $3,355 | Implemented |
WV0595 # 06 Y:2020 | 06 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $650 | $1,100 | Implemented |
WV0595 # 07 Y:2020 | 07 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $315 | $406 | Implemented |
WV0595 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $188 | $305 | Implemented |
SD0594 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,863 | $0 | Not Implemented |
SD0594 # 01 Y:2020 | 01 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,740 | $8,700 | Not Implemented |
SD0594 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,323 | $11,533 | Not Implemented |
SD0594 # 04 Y:2020 | 04 | 2020 | PAY UTILITY BILLS ON TIME | $25,266 | $0 | Not Implemented |
UD1016 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,232 | $18,000 | Implemented |
UD1016 # 07 Y:2020 | 07 | 2020 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $772 | $50 | Not Implemented |