Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,855
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0308 # 04 Y:1987 | 04 | 1987 | INSULATE BARE EQUIPMENT | $603 | $1,440 | Implemented |
TN0308 # 05 Y:1987 | 05 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,709 | $165 | Implemented |
TN0308 # 06 Y:1987 | 06 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $950 | $470 | Implemented |
TN0308 # 07 Y:1987 | 07 | 1987 | OPTIMIZE PLANT POWER FACTOR | $1,764 | $6,800 | Implemented |
CO0090 # 01 Y:1987 | 01 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $381 | $200 | Implemented |
CO0090 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $528 | $350 | Implemented |
CO0090 # 04 Y:1987 | 04 | 1987 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $689 | $1,200 | Implemented |
CO0090 # 05 Y:1987 | 05 | 1987 | AIR CONDITION ONLY SPACE NECESSARY | $556 | $100 | Implemented |
CO0090 # 06 Y:1987 | 06 | 1987 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $375 | $500 | Implemented |
CO0090 # 07 Y:1987 | 07 | 1987 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,133 | $2,000 | Implemented |
CO0090 # 08 Y:1987 | 08 | 1987 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,147 | $1,350 | Implemented |
CO0090 # 09 Y:1987 | 09 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $65 | $90 | Implemented |
CO0090 # 10 Y:1987 | 10 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $999 | $1,000 | Implemented |
KU0220 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,362 | $3,200 | Implemented |
KU0220 # 03 Y:1987 | 03 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $280 | $0 | Implemented |
KU0220 # 05 Y:1987 | 05 | 1987 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $113 | $10 | Implemented |
TN0301 # 01 Y:1987 | 01 | 1987 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,386 | $6,000 | Implemented |
TN0301 # 02 Y:1987 | 02 | 1987 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $1,628 | $0 | Implemented |
TN0301 # 03 Y:1987 | 03 | 1987 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,200 | $400 | Implemented |
TN0301 # 04 Y:1987 | 04 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,618 | $75 | Implemented |
TN0303 # 01 Y:1987 | 01 | 1987 | INSTALL SET-BACK TIMERS | $11,719 | $0 | Implemented |
TN0303 # 02 Y:1987 | 02 | 1987 | INSULATE BARE EQUIPMENT | $7,037 | $1,200 | Implemented |
TN0303 # 03 Y:1987 | 03 | 1987 | INSULATE BARE EQUIPMENT | $1,769 | $1,904 | Implemented |
TN0303 # 04 Y:1987 | 04 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,973 | $780 | Implemented |
TN0303 # 06 Y:1987 | 06 | 1987 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $948 | $3,960 | Implemented |