Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,855
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0152 # 07 Y:1985 | 07 | 1985 | REDUCE VENTILATION AIR | $877 | $100 | Implemented |
KU0152 # 08 Y:1985 | 08 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $176 | $600 | Implemented |
KU0152 # 09 Y:1985 | 09 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $155 | $280 | Implemented |
KU0152 # 11 Y:1985 | 11 | 1985 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $233 | $14 | Implemented |
KU0152 # 12 Y:1985 | 12 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $189 | $20 | Implemented |
KU0152 # 13 Y:1985 | 13 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $209 | $0 | Implemented |
LT0017 # 03 Y:1985 | 03 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,540 | $150 | Implemented |
LT0017 # 04 Y:1985 | 04 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,960 | $13,000 | Implemented |
LT0017 # 06 Y:1985 | 06 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,190 | $10,000 | Implemented |
MA0019 # 01 Y:1985 | 01 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,633 | $900 | Implemented |
MA0019 # 02 Y:1985 | 02 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,403 | $800 | Implemented |
CO0018 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $511 | $300 | Implemented |
CO0018 # 03 Y:1985 | 03 | 1985 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $17,952 | $100 | Implemented |
CO0018 # 04 Y:1985 | 04 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $54 | $92 | Implemented |
CO0018 # 05 Y:1985 | 05 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $304 | $51 | Implemented |
CO0018 # 06 Y:1985 | 06 | 1985 | USE OPTIMUM THICKNESS INSULATION | $550 | $210 | Implemented |
CO0018 # 07 Y:1985 | 07 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $8,891 | $2,400 | Implemented |
CO0018 # 08 Y:1985 | 08 | 1985 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $246 | $50 | Implemented |
CO0018 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,938 | $798 | Implemented |
UD0150 # 01 Y:1985 | 01 | 1985 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,440 | $0 | Implemented |
UD0150 # 04 Y:1985 | 04 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $646 | $140 | Implemented |
UD0150 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $702 | $3,000 | Implemented |
UD0150 # 06 Y:1985 | 06 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,218 | $1,360 | Implemented |
TS0010 # 01 Y:1985 | 01 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,024 | $1,500 | Implemented |
TS0010 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $876 | $94 | Implemented |