IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

216

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0619 # 06 Y:2024 06 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,257 $5,940 Implemented
UF0619 # 09 Y:2024 09 2024 AUTOMATE FINISHING PROCESS $315,000 $181,056 Implemented
UF0619 # 05 Y:2024 05 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,458 $9,470 Implemented
UF0619 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,007 $0 Implemented
UF0619 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,655 $13,445 Implemented
UF0619 # 01 Y:2024 01 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,482 $6,000 Implemented
UF0619 # 10 Y:2024 10 2024 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $300,000 $183,056 Implemented
UF0619 # 08 Y:2024 08 2024 UPGRADE CONTROLS ON COMPRESSORS $705 $1,252 Implemented
MI0434 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,323 $7,394 Implemented
MI0434 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $14,048 $0 Implemented
MI0434 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,530 $960 Implemented
MI0434 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,225 $2,000 Implemented
MI0434 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $29,836 $550 Implemented
MI0413 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,004 $1,980 Implemented
MI0413 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,034 $580 Implemented
MI0413 # 09 Y:2022 09 2022 INSTALL OCCUPANCY SENSORS $355 $140 Implemented
MI0413 # 08 Y:2022 08 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $755 $645 Implemented
MI0413 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,013 $5,249 Implemented
MI0413 # 05 Y:2022 05 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,089 $5,264 Implemented
MI0413 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,023 $0 Implemented
UF0575 # 07 Y:2022 07 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $200,000 $0 Implemented
UF0575 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $59,112 $64,054 Implemented
UF0575 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,361 $0 Implemented
UF0575 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $320,724 $1,068,750 Implemented
UF0575 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,831 $290 Implemented