IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

388

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0562 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,200 $4,000 Not Implemented
UD0562 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,677 $1,040 Implemented
UD0562 # 05 Y:1999 05 1999 FILTER AND REUSE HYDRAULIC OIL $5,340 $4,000 Not Implemented
UD0562 # 06 Y:1999 06 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,976 $13,500 Not Implemented
UD0562 # 07 Y:1999 07 1999 RECYCLE CLEANING SOLVENT AND REUSE $2,344 $4,000 Not Implemented
UD0562 # 08 Y:1999 08 1999 REPROCESS SPENT OILS ON SITE FOR RE-USE $2,041 $3,000 Not Implemented
UD0558 # 01 Y:1998 01 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,790 $8,000 Implemented
UD0558 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,343 $45,360 Implemented
UD0558 # 03 Y:1998 03 1998 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $7,068 $7,600 Not Implemented
UD0558 # 04 Y:1998 04 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,453 $8,000 Implemented
UD0558 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,200 $0 Implemented
UD0508 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $7,200 $60,000 Implemented
UD0508 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,088 $2,314 Implemented
UD0508 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,041 $8,081 Implemented
UD0508 # 04 Y:1996 04 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $31,719 $11,000 Implemented
UD0508 # 05 Y:1996 05 1996 ELIMINATE/REDUCE AN OPERATION $9,650 $5,000 Not Implemented
UD0508 # 06 Y:1996 06 1996 ELIMINATE/REDUCE AN OPERATION $8,523 $0 Implemented
UD0508 # 07 Y:1996 07 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $101,584 $40,000 Implemented
UD0508 # 08 Y:1996 08 1996 INSTALL AN UNINTERUPTABLE POWER SUPPLY $135,600 $222,868 Implemented
UD0508 # 09 Y:1996 09 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,158 $2,286 Implemented
UD0508 # 10 Y:1996 10 1996 RECOVER AND REUSE COOLING WATER $5,108 $5,000 Implemented
UD0467 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $68,000 $72,000 Implemented
UD0467 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,434 $3,000 Implemented
UD0467 # 03 Y:1995 03 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,135 $150,000 Not Implemented
UD0462 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $3,052 $9,500 Not Implemented