IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,559

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0517 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,730 $5,500 Not Implemented
WI0515 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,672 $64,000 Not Implemented
WI0515 # 02 Y:2006 02 2006 ELIMINATE SHIFT $10,200 $0 Implemented
WI0515 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,857 $3,600 Not Implemented
WI0515 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,559 $0 Implemented
WI0515 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,038 $1,280 Implemented
WI0515 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $0 Not Implemented
WI0515 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $907 $0 Not Implemented
AM0509 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $2,080 $3,690 Implemented
AM0509 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $1,650 $250 Implemented
AM0509 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,010 $913 Implemented
AM0509 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $560 $250 Implemented
AM0509 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $440 $0 Implemented
LM0115 # 04 Y:2006 04 2006 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $55,692 $7,875 Not Implemented
LM0115 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,535 $200 Not Implemented
LM0115 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $947 $200 Not Implemented
LM0115 # 03 Y:2006 03 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,573 $0 Not Implemented
WI0514 # 09 Y:2006 09 2006 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,616 $0 Not Implemented
WI0514 # 10 Y:2006 10 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,084 $0 Not Implemented
WI0514 # 01 Y:2006 01 2006 IMPROVE SPACE COMFORT CONDITIONING $156,640 $48,500 Not Implemented
WI0514 # 02 Y:2006 02 2006 IMPROVE SPACE COMFORT CONDITIONING $9,074 $900 Implemented
WI0514 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,466 $6,300 Implemented
WI0514 # 04 Y:2006 04 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $665 $0 Not Implemented
WI0514 # 05 Y:2006 05 2006 COVER OPEN TANKS $2,414 $0 Not Implemented
WI0514 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,412 $0 Not Implemented