IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

459

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0159 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,171 $0 Implemented
SU0159 # 05 Y:2003 05 2003 REPLACE BOILER $1,148 $13,507 Implemented
SU0159 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,028 $0 Implemented
SU0159 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $276 $523 Implemented
SU0131 # 01 Y:2002 01 2002 CHANGE PRODUCT SPECS $14,930 $2,500 Not Implemented
SU0131 # 02 Y:2002 02 2002 ELIMINATE/REDUCE AN OPERATION $2,391 $115 Not Implemented
SU0131 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $997 $102 Implemented
SU0131 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $917 $115 Not Implemented
SU0131 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $775 $193 Implemented
SU0131 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $197 $0 Not Implemented
SU0127 # 01 Y:2002 01 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,500 $0 Not Implemented
SU0127 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,022 $416 Not Implemented
SU0127 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $781 $125 Not Implemented
SU0127 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $574 $3,275 Not Implemented
SU0127 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $377 $0 Not Implemented
SU0127 # 06 Y:2002 06 2002 INSTALL SKYLIGHTS $115 $697 Implemented
SU0127 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $45 $158 Not Implemented
SU0109 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,244 $0 Not Implemented
SU0109 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $28 $0 Implemented
SU0109 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $1,123 $213 Implemented
SU0109 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,246 $662 Implemented
SU0109 # 05 Y:2001 05 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,828 $30 Implemented
SU0109 # 06 Y:2001 06 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $982 $0 Not Implemented
SU0121 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,756 $450 Not Implemented
SU0121 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $508 $945 Implemented