IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

753

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0166 # 04 Y:1999 04 1999 INSTALL AN UNINTERUPTABLE POWER SUPPLY $1,395 $3,000 Not Implemented
SD0215 # 01 Y:1999 01 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $3,652 $3,480 Not Implemented
SD0215 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,635 $6,257 Implemented
SD0215 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $1,080 $906 Not Implemented
SD0215 # 04 Y:1999 04 1999 REDUCE VENTILATION AIR $2,763 $1,600 Not Implemented
SD0215 # 05 Y:1999 05 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $1,153 $3,000 Not Implemented
SD0215 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,300 $7,000 Not Implemented
SD0215 # 07 Y:1999 07 1999 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $13,012 $0 Not Implemented
SD0215 # 08 Y:1999 08 1999 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $507,180 $5,000 Not Implemented
SF0161 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $834 $389 Not Implemented
SF0161 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,859 $1,055 Not Implemented
SF0161 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,053 $1,408 Not Implemented
SF0161 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,081 $8,340 Not Implemented
SD0214 # 01 Y:1999 01 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $6,221 $5,880 Not Implemented
SD0214 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,699 $10,196 Implemented
SD0214 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,874 $1,100 Not Implemented
SD0214 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $38,175 $12,000 Not Implemented
SD0214 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $800 $0 Implemented
SD0214 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,832 $1,000 Implemented
SD0214 # 07 Y:1999 07 1999 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $3,600 $2,300 Implemented
SD0214 # 08 Y:1999 08 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $86,788 $60,000 Not Implemented
SD0210 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $901 $0 Not Implemented
SD0210 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,500 $36,250 Not Implemented
SD0210 # 03 Y:1998 03 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,860 $3,100 Not Implemented
SF0149 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $690 $15 Implemented