IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0963 # 03 Y:2017 03 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,937 $38,220 Implemented
OK0963 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $272 $0 Implemented
KU0545 # 09 Y:2000 09 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,530 $3,000 Not Implemented
KU0545 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,580 $1,150 Implemented
KU0545 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,890 $20 Implemented
KU0545 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,420 $15,470 Implemented
KU0545 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,020 $0 Implemented
KU0545 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,510 $1,770 Implemented
KU0545 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $12,740 $4,370 Implemented
KU0545 # 08 Y:2000 08 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $19,600 $11,400 Not Implemented
KU0545 # 06 Y:2000 06 2000 COMBINE UTILITY METERS $1,450 $4,000 Implemented
KU0246 # 08 Y:1988 08 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $116 $0 Implemented
KU0246 # 05 Y:1988 05 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,278 $0 Implemented
KU0246 # 04 Y:1988 04 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,886 $3,600 Implemented
KU0246 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,601 $300 Implemented
KU0246 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $2,577 $800 Implemented
KU0246 # 06 Y:1988 06 1988 INSULATE BARE EQUIPMENT $791 $200 Not Implemented
KU0246 # 07 Y:1988 07 1988 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $239 $200 Implemented
KU0246 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,686 $1,650 Implemented
KU0179 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $1,450 Implemented
KU0176 # 04 Y:1985 04 1985 REDUCE VENTILATION AIR $227 $200 Not Implemented
KU0179 # 02 Y:1985 02 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,693 $764 Not Implemented
KU0179 # 06 Y:1985 06 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $174 $0 Implemented
KU0176 # 05 Y:1985 05 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $203 $0 Implemented
KU0179 # 04 Y:1985 04 1985 USE OPTIMUM THICKNESS INSULATION $730 $1,138 Not Implemented