IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0749 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,067 $3,000 Implemented
MA0749 # 12 Y:2015 12 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,079 $100 Implemented
MA0693 # 03 Y:2012 03 2012 REPAIR AND ELIMINATE STEAM LEAKS $9,000 $4,200 Implemented
MA0693 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,572 $4,200 Implemented
MA0693 # 02 Y:2012 02 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,776 $43,000 Not Implemented
MA0693 # 01 Y:2012 01 2012 PAY UTILITY BILLS ON TIME $25,247 $500 Implemented
MA0693 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,573 $27,000 Not Implemented
MA0693 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $373 $600 Not Implemented
MA0693 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $486 $200 Not Implemented
MA0694 # 08 Y:2012 08 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $253 $900 Not Implemented
MA0694 # 06 Y:2012 06 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,515 $3,410 Not Implemented
MA0694 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $503 $900 Implemented
MA0694 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $2,300 $16,608 Implemented
MA0694 # 03 Y:2012 03 2012 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $5,619 $0 Implemented
MA0694 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $3,042 $665 Not Implemented
MA0694 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,023 $500 Implemented
MA0694 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $7,473 $0 Not Implemented
MA0666 # 03 Y:2010 03 2010 ADD AREA LIGHTING SWITCHES $1,900 $500 Implemented
MA0666 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,085 $8,685 Not Implemented
MA0666 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $550 $200 Not Implemented
MA0666 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,146 $5,990 Not Implemented
MA0640 # 01 Y:2008 01 2008 REDUCE VENTILATION AIR $36,692 $39,000 Implemented
MA0640 # 04 Y:2008 04 2008 MINIMIZE WATER USAGE $4,210 $18,000 Not Implemented
MA0640 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,895 $3,000 Implemented
MA0640 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $644 $689 Implemented