Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

285

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0504 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $363 $850 Not Implemented
NC0504 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $103 $100 Implemented
NC0504 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $333 $50 Implemented
NC0504 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $686 $25 Not Implemented
NC0449 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,521 $3,200 Not Implemented
NC0449 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,027 $6,500 Not Implemented
NC0449 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,288 $37,820 Not Implemented
NC0449 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,300 $10,168 Implemented
NC0449 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $883 $1,560 Implemented
NC0449 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,096 $50,000 Not Implemented
NC0430 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,839 $0 Implemented
NC0430 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,052 $100 Implemented
NC0430 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,314 $150 Implemented
NC0430 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,250 $22,950 Not Implemented
NC0430 # 07 Y:2011 07 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $30,360 $161,900 Not Implemented
NC0430 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,385 $4,833 Implemented
NC0430 # 05 Y:2011 05 2011 REPLACE BOILER $3,539 $11,800 Not Implemented
NC0418 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,540 $37,837 Not Implemented
NC0418 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $202 $600 Not Implemented
NC0418 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,663 $100 Implemented
NC0418 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $133 $567 Not Implemented
NC0418 # 07 Y:2011 07 2011 ADOPT IN-HOUSE MATERIAL GENERATION $5,969 $25,000 Not Implemented
NC0418 # 01 Y:2011 01 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $244,640 $566,702 Not Implemented
NC0418 # 02 Y:2011 02 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $30,535 $5,000 Implemented
NC0385 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,357 $500 Implemented