IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

173

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0454 # 07 Y:2014 07 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $28,103 $27,500 Not Implemented
SF0454 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $6,081 $0 Implemented
MZ0157 # 01 Y:2014 01 2014 INSULATE BARE EQUIPMENT $571 $601 Not Implemented
MZ0157 # 02 Y:2014 02 2014 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $1,077 $10,750 Implemented
MZ0157 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,149 $30,133 Implemented
MZ0157 # 04 Y:2014 04 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,223 $17,400 Not Implemented
MZ0157 # 05 Y:2014 05 2014 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,840 $9,600 Implemented
BS0040 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,421 $2,496 Not Implemented
BS0040 # 02 Y:2014 02 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,977 $470 Not Implemented
BS0040 # 09 Y:2014 09 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $51 $119 Not Implemented
BS0040 # 08 Y:2014 08 2014 AIR CONDITION ONLY SPACE NECESSARY $122 $95 Not Implemented
BS0040 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $610 $360 Not Implemented
BS0040 # 06 Y:2014 06 2014 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $232 $221 Not Implemented
BS0040 # 05 Y:2014 05 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $316 $464 Not Implemented
BS0040 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $722 Implemented
BS0040 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $887 $2,075 Implemented
CO0693 # 04 Y:2014 04 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,260 $1,250 Implemented
CO0693 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,450 $50,000 Implemented
CO0693 # 02 Y:2014 02 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,940 $6,400 Not Implemented
CO0693 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,130 $570 Implemented
SU0364 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,052 $0 Implemented
SU0364 # 04 Y:2014 04 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $695 $870 Not Implemented
SU0364 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $296 $0 Not Implemented
SU0364 # 09 Y:2014 09 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $175 $620 Not Implemented
SU0364 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,567 $0 Not Implemented