IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,551

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1025 # 07 Y:2020 07 2020 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $548 $0 Not Implemented
CL2007 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,082 $10,098 Implemented
CL2007 # 02 Y:2020 02 2020 INSULATE BARE EQUIPMENT $936 $5,431 Implemented
CL2007 # 03 Y:2020 03 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $58,440 $10,000 Not Implemented
CL2007 # 04 Y:2020 04 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $637 $630 Not Implemented
WV0592 # 01 Y:2020 01 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,201 $9,500 Implemented
WV0592 # 02 Y:2020 02 2020 RECYCLE WHITE WATER $6,078 $6,252 Not Implemented
WV0592 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,217 $9,054 Implemented
WV0592 # 04 Y:2020 04 2020 MINIMIZE WATER USAGE $3,145 $2,100 Implemented
WV0592 # 05 Y:2020 05 2020 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,832 $4,720 Not Implemented
WV0592 # 06 Y:2020 06 2020 INSTALL SET-BACK TIMERS $1,823 $222 Implemented
WV0592 # 07 Y:2020 07 2020 UPGRADE CONTROLS ON COMPRESSORS $1,361 $3,757 Not Implemented
WV0592 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $964 $3,240 Implemented
WV0592 # 09 Y:2020 09 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $829 $3,850 Not Implemented
WV0592 # 10 Y:2020 10 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $723 $1,312 Implemented
WV0592 # 11 Y:2020 11 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $397 $36 Implemented
WV0592 # 12 Y:2020 12 2020 DEVELOP A REPAIR/REPLACE POLICY $372 $303 Implemented
WV0592 # 13 Y:2020 13 2020 INSULATE BARE EQUIPMENT $157 $742 Implemented
WV0592 # 14 Y:2020 14 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $47 $250 Not Implemented
TT0233 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,084 $30,000 Implemented
TT0233 # 02 Y:2020 02 2020 METER WASTE WATER $52,049 $2,000 Implemented
TT0233 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $43,091 $147,540 Implemented
TT0233 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,859 $20 Implemented
TT0233 # 05 Y:2020 05 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,206 $22,392 Not Implemented
TT0233 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,658 $2,000 Implemented