IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

220

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0104 # 13 Y:2013 13 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $10,200 $3,800 Not Implemented
DL0104 # 14 Y:2013 14 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $29,700 $1,320 Not Implemented
DL0104 # 15 Y:2013 15 2013 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $18,800 $45,000 Not Implemented
DL0104 # 16 Y:2013 16 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,505 $10,700 Not Implemented
DL0104 # 17 Y:2013 17 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,800 $37,400 Not Implemented
DL0104 # 18 Y:2013 18 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,900 $45,000 Not Implemented
DL0104 # 19 Y:2013 19 2013 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $19,700 $100 Not Implemented
DL0039 # 02 Y:2009 02 2009 USE "WASH-LESS" PROCESSING EQUIPMENT $4,000 $0 Implemented
DL0039 # 03 Y:2009 03 2009 ADD AREA LIGHTING SWITCHES $5,647 $3,600 Not Implemented
DL0039 # 04 Y:2009 04 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,511 $263 Not Implemented
DL0039 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $248 $150 Not Implemented
DL0039 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,580 $2,450 Not Implemented
DL0039 # 07 Y:2009 07 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,500 $4,700 Not Implemented
DL0039 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $4,047 $0 Implemented
LE0273 # 01 Y:2008 01 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $40,528 $972,000 Not Implemented
LE0273 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,813 $42,521 Implemented
LE0273 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $381 $180 Not Implemented
LE0273 # 08 Y:2008 08 2008 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,177 $3,120 Not Implemented
LE0273 # 07 Y:2008 07 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,895 $7,800 Implemented
LE0273 # 06 Y:2008 06 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,118 $6,000 Not Implemented
LE0273 # 05 Y:2008 05 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,907 $214 Not Implemented
LE0273 # 04 Y:2008 04 2008 USE SOLAR HEAT TO HEAT WATER $10,101 $2,730 Not Implemented
LE0273 # 03 Y:2008 03 2008 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $11,082 $1,560 Not Implemented
LE0273 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,519 $1,440 Implemented
LE0228 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $988 $1,700 Implemented