IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,551

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0283 # 02 Y:2015 02 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $54,079 $166,590 Not Implemented
MI0283 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $20,030 $160 Implemented
MI0283 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,361 $1,660 Implemented
MI0283 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,483 $9,820 Implemented
MI0283 # 06 Y:2015 06 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,494 $1,400 Not Implemented
MI0283 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $942 $40 Not Implemented
MI0283 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $688 $639 Implemented
MI0283 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $684 $177 Not Implemented
MA0749 # 01 Y:2015 01 2015 REDUCE VENTILATION AIR $30,757 $20,400 Implemented
MA0749 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $24,207 $1,000 Implemented
MA0749 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,980 $3,330 Implemented
MA0749 # 04 Y:2015 04 2015 OPTIMIZE PLANT POWER FACTOR $10,366 $25,300 Not Implemented
MA0749 # 05 Y:2015 05 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,523 $1,000 Not Implemented
MA0749 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,856 $24,500 Implemented
MA0749 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,067 $3,000 Implemented
MA0749 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,495 $500 Not Implemented
MA0749 # 09 Y:2015 09 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $3,372 $1,000 Implemented
MA0749 # 10 Y:2015 10 2015 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,592 $500 Not Implemented
MA0749 # 11 Y:2015 11 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,227 $1,013 Not Implemented
MA0749 # 12 Y:2015 12 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,079 $100 Implemented
SD0514 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $188,380 $121,434 Implemented
SD0514 # 02 Y:2015 02 2015 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $34,024 $1,200 Implemented
SD0514 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,935 $2,000 Implemented
SD0514 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $2,376 $3,380 Implemented
SD0514 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,336 $400 Not Implemented