Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,810
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0262 # 02 Y:2025 | 02 | 2025 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $14,276 | $180,000 | n/a |
UU0262 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $24,314 | $29,878 | n/a |
UU0262 # 04 Y:2025 | 04 | 2025 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $13,561 | $178,488 | n/a |
UU0262 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $762 | $2,640 | n/a |
UU0262 # 06 Y:2025 | 06 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $720 | $1,680 | n/a |
UU0262 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,117 | $834 | n/a |
UU0262 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $5,129 | $12,300 | n/a |
GT0988 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $14,344 | $800 | n/a |
GT0988 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $5,947 | $400 | n/a |
GT0988 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,172 | $1,850 | n/a |
GT0988 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $598 | $200 | n/a |
GT0988 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $10,998 | $47,093 | n/a |
GT0988 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $91,923 | $962,674 | n/a |
SJ0029 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $137,645 | $376,457 | n/a |
SJ0029 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,400 | $1,940 | n/a |
SJ0029 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $78 | $0 | n/a |
SJ0029 # 04 Y:2025 | 04 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,874 | $6,782 | n/a |
SJ0029 # 05 Y:2025 | 05 | 2025 | INSULATE BARE EQUIPMENT | $378 | $574 | n/a |
SJ0029 # 06 Y:2025 | 06 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,952 | $0 | n/a |
OK1133 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $878 | $1,370 | Not Implemented |
OK1133 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,461 | $163,800 | Not Implemented |
OK1133 # 03 Y:2025 | 03 | 2025 | OPTIMIZE PLANT POWER FACTOR | $5,711 | $4,416 | Not Implemented |
OK1133 # 04 Y:2025 | 04 | 2025 | INSTALL SUB-METERING EQUIPMENT | $677 | $990 | Not Implemented |
OK1133 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,253 | $7,180 | Not Implemented |
OK1133 # 06 Y:2025 | 06 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $10,095 | $25,179 | Not Implemented |