IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA3025 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,515 $2,400 Not Implemented
UA3025 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,298 $18,000 Not Implemented
UA3025 # 04 Y:2013 04 2013 UPGRADE CONTROLS ON COMPRESSORS $18,334 $2,000 Not Implemented
UA3025 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $24,911 $4,000 Not Implemented
UA3025 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,774 $8,081 Implemented
UA0070 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,386 $2,900 Not Implemented
UA0070 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,086 $15,744 Not Implemented
UA0070 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,557 $80 Not Implemented
UA0070 # 02 Y:2011 02 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $549 $845 Not Implemented
UA0070 # 01 Y:2011 01 2011 DISCONNECT BALLASTS $47,591 $5,500 Not Implemented
UA0030 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,173 $14,708 Implemented
UA0030 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,168 $80,743 Implemented
UA0030 # 05 Y:2009 05 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $174 $0 Implemented
UA0030 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,368 $1,500 Implemented
UA0030 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,479 $0 Implemented
UA0030 # 04 Y:2009 04 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $60 $66 Not Implemented
UA0030 # 03 Y:2009 03 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,426 $3,200 Not Implemented
UA0023 # 02 Y:2008 02 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $76 $325 Not Implemented
UA0023 # 01 Y:2008 01 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,336 $3,900 Implemented
UA0023 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $557 $1,000 Implemented
UA0023 # 03 Y:2008 03 2008 UPGRADE OBSOLETE EQUIPMENT $35,422 $4,000 Implemented
UA0023 # 07 Y:2008 07 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $900 $1,552 Implemented
UA0023 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $110 $272 Implemented
UA0023 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $896 $0 Not Implemented
UA0023 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,578 $1,570 Implemented