Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
478
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0619 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,318 | $25,440 | n/a |
UF0619 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,482 | $6,000 | n/a |
UF0619 # 06 Y:2024 | 06 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,257 | $5,940 | n/a |
UF0619 # 08 Y:2024 | 08 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $705 | $1,252 | n/a |
UF0619 # 10 Y:2024 | 10 | 2024 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $300,000 | $183,056 | n/a |
UF0619 # 09 Y:2024 | 09 | 2024 | AUTOMATE FINISHING PROCESS | $315,000 | $181,056 | n/a |
UF0619 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,655 | $13,445 | n/a |
UF0619 # 07 Y:2024 | 07 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,007 | $0 | n/a |
UF0619 # 05 Y:2024 | 05 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,458 | $9,470 | n/a |
UF0619 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,989 | $36,000 | n/a |
MI0434 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $2,333 | $750 | Not Implemented |
MI0434 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,323 | $7,394 | Implemented |
MI0434 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,048 | $0 | Implemented |
MI0434 # 06 Y:2023 | 06 | 2023 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $3,200 | $3,460 | Not Implemented |
MI0434 # 08 Y:2023 | 08 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,530 | $960 | Implemented |
MI0434 # 01 Y:2023 | 01 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $29,836 | $550 | Implemented |
MI0434 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,559 | $12,210 | Not Implemented |
MI0434 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,225 | $2,000 | Implemented |
MI0413 # 09 Y:2022 | 09 | 2022 | INSTALL OCCUPANCY SENSORS | $355 | $140 | Implemented |
MI0413 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,013 | $5,249 | Implemented |
MI0413 # 04 Y:2022 | 04 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,034 | $580 | Implemented |
MI0413 # 05 Y:2022 | 05 | 2022 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,089 | $5,264 | Implemented |
MI0413 # 08 Y:2022 | 08 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $755 | $645 | Implemented |
MI0413 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,004 | $1,980 | Implemented |
MI0413 # 01 Y:2022 | 01 | 2022 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $7,040 | $10,116 | Not Implemented |