IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0769 # 01 Y:2023 01 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $3,018 $7,000 Not Implemented
OR0769 # 02 Y:2023 02 2023 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $9,780 $12,978 Not Implemented
OR0769 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,114 $0 Not Implemented
OR0756 # 03 Y:2022 03 2022 MODIFY CURRENT INCENTIVE PROGRAM $978 $0 Not Implemented
OR0756 # 04 Y:2022 04 2022 PURCHASE EQUIPMENT INSTEAD OF LEASING $38,280 $221,950 Not Implemented
OR0756 # 01 Y:2022 01 2022 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $73,790 $0 Implemented
OR0756 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,116 $120,000 Implemented
OR0741 # 02 Y:2021 02 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $56,371 $0 Not Implemented
OR0741 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,176 $40,448 Not Implemented
OR0741 # 03 Y:2021 03 2021 USE HEAT PUMP FOR SPACE CONDITIONING $25,522 $19,860 Not Implemented
OR0726 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $3,031 $3,570 Not Implemented
OR0726 # 02 Y:2019 02 2019 REDUCE VENTILATION AIR $1,259 $0 Implemented
OR0726 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,581 $7,570 Implemented
OR0687 # 01 Y:2017 01 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $2,090 $600 Not Implemented
OR0687 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $2,967 $2,000 Not Implemented
OR0687 # 05 Y:2017 05 2017 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $6,460 $16,124 Not Implemented
OR0687 # 03 Y:2017 03 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $205,629 $340,000 Not Implemented
OR0687 # 04 Y:2017 04 2017 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,195 $5,650 Not Implemented
OR0604 # 02 Y:2013 02 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $144,955 $110,000 Not Implemented
OR0604 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,634 $500 Implemented
OR0604 # 04 Y:2013 04 2013 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $13,502 $5,712 Not Implemented
OR0604 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $53,512 $43,218 Not Implemented
OR0604 # 05 Y:2013 05 2013 UPGRADE CONTROLS ON COMPRESSORS $11,228 $11,850 Implemented
OR0432 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,900 $32,000 Implemented
OR0432 # 01 Y:2003 01 2003 RECYCLE SPENT TANNING SOLUTION $136,000 $280,000 Not Implemented