Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0699 # 04 Y:2012 04 2012 ELIMINATE/REDUCE AN OPERATION $1,855 $500 Not Implemented
MA0699 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $25,140 $9,900 Implemented
MA0699 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,627 $104,325 Implemented
MA0699 # 05 Y:2012 05 2012 USE HEAT PUMP FOR SPACE CONDITIONING $1,250 $6,500 Implemented
MA0699 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $706 $100 Implemented
MA0699 # 03 Y:2012 03 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $5,019 $24,000 Implemented
MA0624 # 04 Y:2007 04 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $14,298 $11,500 Implemented
MA0624 # 05 Y:2007 05 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $12,255 $75,000 Implemented
MA0624 # 10 Y:2007 10 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $4,007 $12,000 Implemented
MA0624 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,741 $0 Implemented
MA0624 # 08 Y:2007 08 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,655 $4,000 Implemented
MA0624 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,012 $50,000 Implemented
MA0624 # 06 Y:2007 06 2007 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,448 $2,500 Implemented
MA0624 # 02 Y:2007 02 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $47,607 $22,000 Not Implemented
MA0624 # 01 Y:2007 01 2007 REPAIR OR REPLACE STEAM TRAPS $62,300 $24,500 Implemented
MA0624 # 09 Y:2007 09 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,605 $1,000 Not Implemented
MA0624 # 11 Y:2007 11 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,570 $15,700 Not Implemented
MA0624 # 12 Y:2007 12 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,045 $5,670 Implemented
MA0319 # 04 Y:1994 04 1994 USE SYNTHETIC LUBRICANT $2,218 $555 Not Implemented
MA0319 # 06 Y:1994 06 1994 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,125 $2,197 Not Implemented
MA0319 # 05 Y:1994 05 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $919 $3,119 Not Implemented
MA0319 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $4,412 $10,920 Not Implemented
MA0319 # 02 Y:1994 02 1994 OPTIMIZE PLANT POWER FACTOR $5,357 $12,000 Implemented
MA0319 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,463 $10,240 Not Implemented
MA0166 # 01 Y:1989 01 1989 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $19,320 $18,000 Not Implemented