IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

109

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0380 # 05 Y:1989 05 1989 INSTALL SET-BACK TIMERS $370 $0 Not Implemented
GT0380 # 06 Y:1989 06 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,550 $0 Not Implemented
GT0380 # 07 Y:1989 07 1989 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $3,560 $4,000 Implemented
GT0380 # 08 Y:1989 08 1989 USE RADIANT HEATER FOR SPOT HEATING $3,840 $19,500 Implemented
GT0380 # 09 Y:1989 09 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,600 $29,600 Not Implemented
MA0152 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,378 $527 Implemented
MA0152 # 02 Y:1989 02 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,925 $40,371 Not Implemented
MA0152 # 03 Y:1989 03 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,765 $2,300 Not Implemented
MA0152 # 04 Y:1989 04 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,320 $18,000 Not Implemented
MA0152 # 05 Y:1989 05 1989 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $208 $0 Implemented
MA0152 # 06 Y:1989 06 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $400 $0 Implemented
TN0368 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,877 $0 Not Implemented
TN0368 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $4,310 $2,994 Not Implemented
TN0368 # 03 Y:1989 03 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,212 $7,800 Not Implemented
TN0368 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,470 $1,190 Not Implemented
TN0368 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,946 $1,470 Not Implemented
TN0368 # 06 Y:1989 06 1989 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $6,287 $25,000 Not Implemented
TN0368 # 07 Y:1989 07 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,013 $0 Not Implemented
TN0368 # 08 Y:1989 08 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $1,328 $450 Not Implemented
TN0368 # 09 Y:1989 09 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $319 $360 Not Implemented
KU0277 # 01 Y:1989 01 1989 REDUCE VENTILATION AIR $7,959 $2,250 Not Implemented
KU0277 # 02 Y:1989 02 1989 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,065 $2,775 Not Implemented
KU0277 # 03 Y:1989 03 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,439 $3,600 Not Implemented
KU0277 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,101 $2,112 Not Implemented
KU0277 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,474 $300 Not Implemented