IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

201

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0334 # 07 Y:2002 07 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,710 $5,232 Not Implemented
AS0334 # 06 Y:2002 06 2002 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $3,596 $60 Not Implemented
AS0334 # 05 Y:2002 05 2002 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $32,221 $12,000 Not Implemented
AS0334 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $424 $441 Not Implemented
AS0334 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $667 $1,350 Not Implemented
AS0334 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,247 $312 Not Implemented
AS0334 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,317 $0 Not Implemented
CO0511 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $4,380 $990 Not Implemented
CO0511 # 09 Y:2002 09 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $100 $0 Not Implemented
CO0511 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $0 Not Implemented
CO0511 # 06 Y:2002 06 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,290 $1,200 Not Implemented
CO0511 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,420 $190 Implemented
CO0511 # 04 Y:2002 04 2002 USE HEAT PUMP FOR SPACE CONDITIONING $4,020 $0 Not Implemented
CO0511 # 01 Y:2002 01 2002 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $12,040 $9,500 Not Implemented
CO0511 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $10,160 $14,010 Not Implemented
CO0511 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $370 $300 Not Implemented
SD0305 # 05 Y:2002 05 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,100 $5,000 Not Implemented
SD0305 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,294 $20,368 Not Implemented
SD0305 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,481 $10,300 Not Implemented
SD0305 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,106 $0 Not Implemented
SD0305 # 06 Y:2002 06 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,150 $0 Not Implemented
SD0305 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $896 $1,800 Implemented
MS0213 # 03 Y:2002 03 2002 DISCONNECT BALLASTS $1,168 $660 Not Implemented
MS0213 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $377 $455 Not Implemented
MS0213 # 06 Y:2002 06 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $15,739 $22,000 Not Implemented