Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
211
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0426 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,221 | $1,000 | Implemented |
AS0426 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,539 | $15,085 | Implemented |
AS0426 # 08 Y:2006 | 08 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,590 | $20,832 | Not Implemented |
AS0426 # 09 Y:2006 | 09 | 2006 | USE SOLAR HEAT TO HEAT WATER | $3,172 | $14,400 | Not Implemented |
WV0344 # 07 Y:2006 | 07 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $8,710 | $44 | Not Implemented |
WV0344 # 06 Y:2006 | 06 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $16,147 | $26,662 | Implemented |
WV0344 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $18,000 | $32,500 | Implemented |
WV0344 # 04 Y:2006 | 04 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $22,182 | $27,387 | Implemented |
WV0344 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,895 | $15 | Not Implemented |
WV0344 # 02 Y:2006 | 02 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $41,030 | $1,000 | Implemented |
WV0344 # 01 Y:2006 | 01 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $50,956 | $1,472 | Implemented |
WV0344 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,355 | $12,137 | Implemented |
WV0344 # 09 Y:2006 | 09 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,629 | $0 | Implemented |
WV0344 # 14 Y:2006 | 14 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $217 | $100 | Not Implemented |
WV0344 # 13 Y:2006 | 13 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,197 | $1,811 | Implemented |
WV0344 # 12 Y:2006 | 12 | 2006 | ISOLATE HOT OR COLD EQUIPMENT | $1,256 | $1,500 | Not Implemented |
WV0344 # 11 Y:2006 | 11 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,355 | $436 | Implemented |
WV0344 # 10 Y:2006 | 10 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,177 | $1,896 | Implemented |
AM0515 # 01 Y:2006 | 01 | 2006 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $1,467,000 | $250,000 | Not Implemented |
AM0515 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,690 | $3,800 | Not Implemented |
AM0515 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $4,440 | $1,580 | Implemented |
AM0515 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $66,000 | $65,000 | Implemented |
AM0515 # 04 Y:2006 | 04 | 2006 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $29,840 | $13,000 | Not Implemented |
AM0515 # 08 Y:2006 | 08 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $6,900 | $80 | Implemented |
AM0515 # 02 Y:2006 | 02 | 2006 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $897,000 | $3,260,000 | Not Implemented |