IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 361 Electric Distribution Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0462 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,640 $300 Implemented
BD0462 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,604 $3,500 Implemented
BD0462 # 04 Y:2015 04 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,049 $4,000 Implemented
BD0462 # 05 Y:2015 05 2015 REPLACE BOILER $3,962 $7,604 Implemented
BD0462 # 01 Y:2015 01 2015 USE RADIANT HEATER FOR SPOT HEATING $9,937 $8,800 Implemented
IC0119 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,048 $38,744 Implemented
IC0119 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,402 $61,775 Implemented
IC0119 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,559 $114,725 Implemented
IC0119 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,829 $600 Implemented
BD0098 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $1,894 $390 Implemented
BD0098 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $902 $300 Implemented
BD0098 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $464 $660 Implemented
BD0098 # 08 Y:1997 08 1997 MINIMIZE WATER USAGE $4,425 $1,375 Implemented
BD0097 # 07 Y:1997 07 1997 ELIMINATE SHIFT $291,200 $120,000 Implemented
BD0097 # 08 Y:1997 08 1997 ELIMINATE SHIFT $249,600 $120,000 Implemented
BD0097 # 06 Y:1997 06 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $600 $300 Implemented
BD0097 # 05 Y:1997 05 1997 MINIMIZE WATER USAGE $792 $1,240 Implemented
BD0097 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $854 $450 Implemented
BD0097 # 01 Y:1997 01 1997 RECOVER WASTE HEAT FROM EQUIPMENT $2,363 $700 Implemented