IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 361 Electric Distribution Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0400 # 02 Y:2010 02 2010 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $9,007 $37,000 Implemented
NC0400 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $1,761 $4,346 Implemented
NC0400 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $75 $200 Implemented
NC0378 # 01 Y:2008 01 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $97,991 $50,000 Implemented
NC0378 # 06 Y:2008 06 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,591 $7,700 Implemented
NC0378 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,481 $100 Implemented
NC0378 # 08 Y:2008 08 2008 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $226,587 $37,500 Implemented
NC0378 # 09 Y:2008 09 2008 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $10,000 $1,000 Implemented
NC0378 # 11 Y:2008 11 2008 USE PHOTOCELL CONTROLS $3,452 $12,000 Implemented
TN0687 # 01 Y:2000 01 2000 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $25,255 $1,075 Implemented
TN0687 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,703 $750 Implemented
TN0687 # 04 Y:2000 04 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,210 $820 Implemented
TN0687 # 06 Y:2000 06 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,289 $2,150 Implemented
TN0687 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,680 $350 Implemented
TN0687 # 10 Y:2000 10 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $720 $0 Implemented