IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 361 Electric Distribution Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0020 # 02 Y:2008 02 2008 USE UTILITY CONTROLLED POWER MANAGEMENT $18,637 $5,000 Implemented
TT0020 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,980 $5,000 Not Implemented
TT0020 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,400 $2,900 Implemented
TT0020 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,320 $3,300 Implemented
TT0020 # 03 Y:2008 03 2008 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,062 $1,000 Not Implemented
TN0689 # 02 Y:2000 02 2000 ELIMINATE/REDUCE AN OPERATION $35,890 $108,460 Not Implemented
TN0689 # 08 Y:2000 08 2000 ADD AREA LIGHTING SWITCHES $3,620 $6,160 Implemented
TN0689 # 01 Y:2000 01 2000 $97,005 $100,000 Implemented
TN0689 # 03 Y:2000 03 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,180 $18,900 Not Implemented
TN0689 # 04 Y:2000 04 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,245 $5,625 Implemented
TN0689 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $6,460 $19,500 Not Implemented
TN0689 # 06 Y:2000 06 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $6,220 $0 Not Implemented
TN0689 # 07 Y:2000 07 2000 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION $4,345 $300 Implemented
TN0689 # 09 Y:2000 09 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $540 $0 Not Implemented
TN0651 # 05 Y:1999 05 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,625 $900 Not Implemented
TN0651 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $3,020 $1,605 Implemented
TN0651 # 06 Y:1999 06 1999 REPROCESS SPENT OILS ON SITE FOR RE-USE $1,465 $2,420 Not Implemented
TN0651 # 07 Y:1999 07 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $880 $1,120 Not Implemented
TN0651 # 01 Y:1999 01 1999 $23,000 $21,000 Not Implemented
TN0651 # 02 Y:1999 02 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $9,040 $9,140 Implemented
TN0651 # 03 Y:1999 03 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,840 $8,000 Not Implemented
TN0329 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,619 $0 Implemented
TN0329 # 07 Y:1988 07 1988 IMPROVE LUBRICATION PRACTICES $1,824 $0 Implemented
TN0329 # 08 Y:1988 08 1988 INSULATE BARE EQUIPMENT $1,151 $566 Not Implemented
TN0329 # 09 Y:1988 09 1988 INSULATE BARE EQUIPMENT $1,106 $146 Implemented