Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

732

matching recommendations
Reset
SIC 361 Electric Distribution Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0051 # 02 Y:1986 02 1986 TURN OFF EQUIPMENT WHEN NOT IN USE $339 $0 Implemented
ST0051 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $92 $40 Implemented
ST0051 # 04 Y:1986 04 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,602 $0 Not Implemented
ST0051 # 05 Y:1986 05 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,847 $800 Not Implemented
ST0051 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,207 $4,638 Implemented
ST0051 # 07 Y:1986 07 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,440 $0 Implemented
ST0051 # 08 Y:1986 08 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,534 $10,000 Not Implemented
ST0051 # 09 Y:1986 09 1986 INSTALL STORM WINDOWS AND DOORS $2,273 $1,000 Not Implemented
ST0051 # 10 Y:1986 10 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,088 $1,200 Not Implemented
OK0175 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678 $1,252 Implemented
OK0175 # 02 Y:1985 02 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,344 $3,461 Not Implemented
OK0175 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $748 $400 Implemented
OK0175 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,056 $330 Not Implemented
OK0175 # 05 Y:1985 05 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,954 $4,000 Implemented
OK0175 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,146 $35,020 Not Implemented
TN0221 # 01 Y:1984 01 1984 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $4,406 $7,000 Not Implemented
TN0221 # 02 Y:1984 02 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,248 $8,600 Not Implemented
TN0221 # 03 Y:1984 03 1984 INSTALL SET-BACK TIMERS $2,849 $10,000 Not Implemented
TN0221 # 04 Y:1984 04 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $773 $475 Implemented
TN0221 # 05 Y:1984 05 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $967 $0 Implemented
TN0221 # 06 Y:1984 06 1984 INSTALL AUTOMATIC STACK DAMPER $148 $420 Implemented
TN0221 # 07 Y:1984 07 1984 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $237 $0 Implemented
UD0137 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $809 $1,894 Not Implemented
UD0137 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $6,700 $3,000 Implemented
UD0085 # 01 Y:1983 01 1983 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $142 $0 Not Implemented